Our decommissioning service: effective, efficient and reliable

On the basis of the knowledge and experience gained in our own projects, we develop strategies and concepts for the decommissioning and dismantling of nuclear power plants together with our customers and accompany them in their implementation. Our customers include operators and research institutions in Germany and Europe.

Treatment of residual materials

An on-site residual material treatment centre optimises decommissioning

Diagram of the residual material treatment centre in Philippsburg
Diagram of the residual material treatment centre in Philippsburg.
Diagram of the residual material treatment centre in Philippsburg
Diagram of the residual material treatment centre in Philippsburg.

Infrastructure for the treatment of residual materials

Flow of residual radioactive waste (process perspective)
Flow of residual radioactive waste (process perspective)
Flow of residual radioactive waste (process perspective)
Flow of residual radioactive waste (process perspective)

Contact

Challenges

Waste and residual material categories

Non-radioactive residual materials and waste
Radioactive waste
Recyclable materials, conventional residual materials
Waste requiring specific approval for free release
Low and intermediate level radioactive waste
e.g. operating waste, radioactive waste from the dismantling work
Highly radioactive heat generating waste
especially spent fuel rods from power operation
Proportion of the total dismantled mass of an EnBW nuclear power plant
Slight differences depending on the power plant
Not relevant for the decommissioning
around 96-98%
around 1-3%
around 1%

Waste and residual material categories in a nuclear power plant

Process for treating residual materials

There are three main processes for treating residual materials
There are three main processes for treating residual materials
There are three main processes for treating residual materials
There are three main processes for treating residual materials