  • Vorarlberger Illwerke AG is currently building the new pumped storage power plant Obervermuntwerk II with 360 MW pump and 360 MW turbine capacity.
    Operational tests of the first machine (180 MW turbine and 180 MW pump power) are planned to start on 27.04.2018.
  • EnBW has decided to build a new gas-fired combined heat and power plant with an electric capacity of 30 MW at Stuttgart-Gaisburg, Germany. Commissioning is planned for end of December 2018. At the commissioning date of the new power plant the current coal-fired power plant HKW Stuttgart-Gaisburg (23 MW) will be decommissioned. Updates will be provided if necessary.

Urgent market messages

EnWB publishes on this website (additionally to the publication on the EEX transparency site) all planned and unplanned non-availabilities relating to the list of power plants operated by EnBW.

The planned and unplanned non-availabilities can be downloaded here (RSS feed).

Selection of the displayed messages

sorting:
  time stamp
  Start of non-availability
Plant unit:
Status:
open
Last update: Apr 25, 2018 1:09:26 PM

1 to 20 of 265 messages found

Page 1 of 14

1 2 3 4 5 Next page Last page
ID Unit Start Expected End Restriction [MW] Fuel Type Reason Last Changed Status
28610 Heizkraftwerk Altbach/Deizisau GT C 02.05.2018
08:00
02.05.2018
14:00
87 Oil Maintenance 25.04.2018
13:09
open
28606 Windpark Baltic 1/Windpark Baltic 2 29.04.2018
06:00
29.04.2018
20:00
10 Wind Maintenance 23.04.2018
06:51
open
28586 Windpark Baltic 1/Windpark Baltic 2 28.04.2018
06:00
28.04.2018
20:00
10 Wind Maintenance 22.04.2018
08:36
open
28585 Windpark Baltic 1/Windpark Baltic 2 27.04.2018
06:00
27.04.2018
20:00
10 Wind Outage 21.04.2018
08:47
open
28584 Windpark Baltic 1/Windpark Baltic 2 26.04.2018
06:00
26.04.2018
20:00
10 Wind Outage 20.04.2018
12:53
open
28578 Heizkraftwerk Stuttgart-Gaisburg 20.04.2018
11:00
01.01.2021
00:00
23 Hard Coal Other 20.04.2018
10:46
open
28562 KKW Neckarwestheim Block 2 29.04.2018
06:30
29.04.2018
20:15
502 Nuclear Maintenance 18.04.2018
09:42
open
28554 Kopswerk 2 M3 09.05.2018
09:00
09.05.2018
11:00
175 Pump Storage Maintenance 16.04.2018
10:11
open
28553 Kopswerk 2 M2 09.05.2018
09:00
09.05.2018
11:00
175 Pump Storage Maintenance 16.04.2018
10:11
open
28552 Kopswerk 2 M1 09.05.2018
09:00
09.05.2018
11:00
175 Hydro Maintenance 16.04.2018
10:11
open
28548 Kopswerk 1 M3 09.05.2018
13:00
09.05.2018
15:00
85 Pump Storage Maintenance 16.04.2018
10:11
open
28547 Kopswerk 1 M2 09.05.2018
13:00
09.05.2018
15:00
96 Pump Storage Maintenance 16.04.2018
10:11
open
28546 Kopswerk 1 M1 09.05.2018
13:00
09.05.2018
15:00
96 Hydro Maintenance 16.04.2018
10:11
open
27919 Kopswerk 2 M2 03.05.2018
07:30
03.05.2018
17:00
175 Pump Storage Maintenance 03.04.2018
08:45
open
27918 Kopswerk 2 M2 02.05.2018
07:30
02.05.2018
17:00
175 Pump Storage Maintenance 03.04.2018
08:44
open
27924 Heizkraftwerk Altbach/Deizisau Block 2 25.01.2018
14:03
04.05.2018
00:00
336 Hard Coal Outage 19.03.2018
19:07
open
27962 Kraftwerk Wehr 02.07.2018
00:00
09.07.2018
00:00
227 Hydro Maintenance 14.03.2018
15:11
open
27963 Kraftwerk Wehr 18.06.2018
00:00
25.06.2018
00:00
227 Hydro Maintenance 14.03.2018
15:11
open
27964 Kraftwerk Wehr 04.06.2018
08:00
11.06.2018
00:00
227 Hydro Maintenance 14.03.2018
15:11
open
28243 Lünerseewerk M5 02.10.2018
07:00
02.10.2018
18:00
56 Pump Storage Maintenance 21.02.2018
11:08
open