Urgent Market Messages (UMMs)

Planned and unplanned non-availabilities

  • Vorarlberger Illwerke AG is currently building the new pumped storage power plant Obervermuntwerk II with 360 MW pump and 360 MW turbine capacity.
    After successful operational tests, the commercial use of the first machine (180 MW turbine and 180 MW pump power) will start on 02.07.2018.
  • EnBW has decided to build a new gas-fired combined heat and power plant with an electric capacity of 30 MW at Stuttgart-Gaisburg, Germany. Commissioning is planned for end of December 2018. At the commissioning date of the new power plant the current coal-fired power plant HKW Stuttgart-Gaisburg (23 MW) will be decommissioned. Updates will be provided if necessary.

Urgent market messages

EnWB publishes on this website (additionally to the publication on the EEX transparency site) all planned and unplanned non-availabilities relating to the list of power plants operated by EnBW.

The planned and unplanned non-availabilities can be downloaded here (RSS feed).

Selection of the displayed messages

sorting:
  time stamp
  Start of non-availability
Plant unit:
Status:
open
Last update: Jul 19, 2018 9:21:49 PM

1 to 20 of 295 messages found

Page 1 of 15

1 2 3 4 5 Next page Last page
ID Unit Start Expected End Restriction [MW] Fuel Type Reason Last Changed Status
29446 Heizkraftwerk Heilbronn Block 7 19.07.2018
21:30
21.07.2018
02:00
80 Hard Coal Maintenance 19.07.2018
21:21
open
29449 Windpark Baltic 1/Windpark Baltic 2 25.07.2018
07:00
25.07.2018
19:00
14 Wind Maintenance 19.07.2018
16:11
open
29448 Windpark Baltic 1/Windpark Baltic 2 24.07.2018
07:00
24.07.2018
19:00
14 Wind Maintenance 19.07.2018
16:10
open
29447 Windpark Baltic 1/Windpark Baltic 2 23.07.2018
07:00
23.07.2018
19:00
14 Wind Maintenance 19.07.2018
16:10
open
29438 Pumpspeicherwerk Glems M2 18.07.2018
19:45
20.07.2018
16:00
40 Pump Storage Maintenance 19.07.2018
15:00
open
29436 Pumpspeicherwerk Glems M1 18.07.2018
19:45
20.07.2018
16:00
40 Hydro Maintenance 19.07.2018
15:00
open
23646 Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 11.06.2018
00:00
23.07.2018
00:00
842 Hard Coal Maintenance 17.07.2018
10:49
open
29428 Rheinhafen-Dampfkraftwerk Karlsruhe Block 7 16.07.2018
13:15
23.07.2018
00:00
50 Hard Coal External factors 17.07.2018
07:15
open
29426 Windpark Baltic 1/Windpark Baltic 2 22.07.2018
07:00
22.07.2018
19:00
14 Wind Maintenance 16.07.2018
10:01
open
29406 Windpark Baltic 1/Windpark Baltic 2 21.07.2018
07:00
21.07.2018
19:00
14 Wind Maintenance 15.07.2018
08:05
open
29400 Windpark Baltic 1/Windpark Baltic 2 20.07.2018
07:00
20.07.2018
19:00
14 Wind Maintenance 14.07.2018
07:28
open
29393 KKW Neckarwestheim Block 2 21.07.2018
06:15
23.07.2018
08:00
439 Nuclear Maintenance 12.07.2018
18:56
open
29389 Rellswerk 20.07.2018
08:00
20.07.2018
12:00
12 Pump Storage Maintenance 12.07.2018
11:56
open
29376 Kraftwerk Wehr 16.07.2018
00:00
21.07.2018
18:00
227 Hydro Maintenance 10.07.2018
17:14
open
29367 Heizkraftwerk Altbach/Deizisau GT A 30.07.2018
00:00
27.08.2018
00:00
50 Oil Maintenance 09.07.2018
10:06
open
29354 Heizkraftwerk Altbach/Deizisau GT B 03.09.2018
00:00
29.09.2018
00:00
57 Oil Maintenance 06.07.2018
11:10
open
29269 Obervermuntwerk 2 M1 30.07.2018
08:00
03.08.2018
17:00
180 Pump Storage Maintenance 28.06.2018
15:49
open
28930 Kopswerk 2 M3 11.04.2019
00:00
19.04.2019
00:00
175 Pump Storage Maintenance 25.06.2018
14:32
open
29171 Rheinhafen-Dampfkraftwerk Karlsruhe Block 7 04.08.2018
00:00
16.08.2018
00:00
505 Hard Coal Maintenance 19.06.2018
12:07
open
29126 Pumpspeicherwerk Glems M1 29.06.2020
00:00
04.07.2020
00:00
40 Hydro Maintenance 12.06.2018
09:48
open