Close Download image Back to top
Green Bond Impact Report 2022

Allocation Report

Download image

Share of proceeds used for new build projects or for refinancing existing projects:

Bond
New build projects
Refinancing
Bond
Green senior bond October 2018 (XS1901055472)
New build projects
48%
Refinancing
52%
Bond
Green subordinated bonds August 2019 (XS2035564975 & XS2035564629)
New build projects
87%
Refinancing
13%
Bond
Green subordinated bond August 2021 (XS2381272207)
New build projects
87%
Refinancing
13%
Bond
Green senior bond November 2022 (XS2558395351)
New build projects
79%
Refinancing
21%
Bond
Green senior bond November 2022 (XS2558395278)
New build projects
-
Refinancing
100%

Overview of green bonds fund allocation

Download image

Allocation report for:

  • 2018 Green senior bond (XS1901055472)
  • 2019 Green subordinated bonds (XS2035564975 & XS2035564629)
  • 2020 Green subordinated bond (XS2196328608)
  • 2021 Green subordinated bond (XS2381272207)
  • 2022 Green senior bond (XS2558395278)
Project category
Project name
Investments attributable to the bond (€m, per category)0Rounded figures
Installed capacity (MW)0Rounded figures
Generation capacity attributable to the bonds (MW) 0Rounded figures
Project category
Green senior bond October 2018 (XS1901055472)
Project category
Wind offshore (Germany)
Project name
Hohe See0New build project (not in operation at the time of first allocation)
Installed capacity (MW)0Rounded figures
521.9
Generation capacity attributable to the bonds (MW) 0Rounded figures
56.9
Project name
Albatros0New build project (not in operation at the time of first allocation)
Installed capacity (MW)0Rounded figures
117.6
Generation capacity attributable to the bonds (MW) 0Rounded figures
10.4
Project category
Total wind offshore (Germany)
Investments attributable to the bond (€m, per category)0Rounded figures
222.8
Installed capacity (MW)0Rounded figures
639.5
Generation capacity attributable to the bonds (MW) 0Rounded figures
67.4
Project category
Wind onshore (Germany)
Project name
Fuerth
Installed capacity (MW)0Rounded figures
16.5
Generation capacity attributable to the bonds (MW) 0Rounded figures
16.1
Project name
Freckenfeld
Installed capacity (MW)0Rounded figures
19.8
Generation capacity attributable to the bonds (MW) 0Rounded figures
9.9
Project name
Langenburg
Installed capacity (MW)0Rounded figures
33.5
Generation capacity attributable to the bonds (MW) 0Rounded figures
33.4
Project name
Winterbach
Installed capacity (MW)0Rounded figures
9.9
Generation capacity attributable to the bonds (MW) 0Rounded figures
4.8
Project name
Aalen-Waldhausen
Installed capacity (MW)0Rounded figures
16.5
Generation capacity attributable to the bonds (MW) 0Rounded figures
9.7
Project name
Buchholz III
Installed capacity (MW)0Rounded figures
13.2
Generation capacity attributable to the bonds (MW) 0Rounded figures
6.6
Project name
Fichtenau
Installed capacity (MW)0Rounded figures
9.9
Generation capacity attributable to the bonds (MW) 0Rounded figures
9.9
Project name
Dünsbach
Installed capacity (MW)0Rounded figures
9.9
Generation capacity attributable to the bonds (MW) 0Rounded figures
5.0
Project name
Bühlertann
Installed capacity (MW)0Rounded figures
13.2
Generation capacity attributable to the bonds (MW) 0Rounded figures
6.6
Project name
Dienstweiler
Installed capacity (MW)0Rounded figures
4.8
Generation capacity attributable to the bonds (MW) 0Rounded figures
2.4
Project name
Homburg
Installed capacity (MW)0Rounded figures
9.6
Generation capacity attributable to the bonds (MW) 0Rounded figures
9.6
Project name
Ruppertshofen III0New build project (not in operation at the time of first allocation)
Installed capacity (MW)0Rounded figures
4.2
Generation capacity attributable to the bonds (MW) 0Rounded figures
2.5
Project name
Boxberg-Angeltürn
Installed capacity (MW)0Rounded figures
12.0
Generation capacity attributable to the bonds (MW) 0Rounded figures
9.3
Project name
Boxberg-Bobstadt
Installed capacity (MW)0Rounded figures
12.0
Generation capacity attributable to the bonds (MW) 0Rounded figures
9.3
Project name
Harthäuser Wald (Extension)
Installed capacity (MW)0Rounded figures
12.0
Generation capacity attributable to the bonds (MW) 0Rounded figures
10.2
Project name
Königheim
Installed capacity (MW)0Rounded figures
6.0
Generation capacity attributable to the bonds (MW) 0Rounded figures
5.9
Project category
Total wind onshore (Germany)
Investments attributable to the bond (€m, per category)0Rounded figures
245.3
Installed capacity (MW)0Rounded figures
203.0
Generation capacity attributable to the bonds (MW) 0Rounded figures
151.2
Project category
Solar / PV (Germany)
Project name
Braunsbach-Zottish.0New build project (not in operation at the time of first allocation)
Installed capacity (MW)0Rounded figures
0.8
Generation capacity attributable to the bonds (MW) 0Rounded figures
0.7
Project name
Ingoldingen0New build project (not in operation at the time of first allocation)
Installed capacity (MW)0Rounded figures
4.4
Generation capacity attributable to the bonds (MW) 0Rounded figures
2.4
Project name
Riedlingen-Zwiefaltendorf0New build project (not in operation at the time of first allocation)
Installed capacity (MW)0Rounded figures
5.2
Generation capacity attributable to the bonds (MW) 0Rounded figures
2.2
Project name
Berghülen
Installed capacity (MW)0Rounded figures
2.7
Generation capacity attributable to the bonds (MW) 0Rounded figures
1.4
Project name
Eggesin
Installed capacity (MW)0Rounded figures
10.0
Generation capacity attributable to the bonds (MW) 0Rounded figures
5.0
Project name
Tuningen
Installed capacity (MW)0Rounded figures
4.5
Generation capacity attributable to the bonds (MW) 0Rounded figures
2.1
Project name
Löffingen0New build project (not in operation at the time of first allocation)
Installed capacity (MW)0Rounded figures
2.7
Generation capacity attributable to the bonds (MW) 0Rounded figures
1.4
Project name
Müssentin0New build project (not in operation at the time of first allocation)
Installed capacity (MW)0Rounded figures
9.3
Generation capacity attributable to the bonds (MW) 0Rounded figures
4.7
Project name
Torgau0New build project (not in operation at the time of first allocation)
Installed capacity (MW)0Rounded figures
4.9
Generation capacity attributable to the bonds (MW) 0Rounded figures
2.5
Project name
Welgesheim
Installed capacity (MW)0Rounded figures
3.2
Generation capacity attributable to the bonds (MW) 0Rounded figures
1.6
Project name
Mühlhausen-Ehingen
Installed capacity (MW)0Rounded figures
8.9
Generation capacity attributable to the bonds (MW) 0Rounded figures
4.5
Project category
Total solar / PV (Germany)
Investments attributable to the bond (€m, per category)0Rounded figures
20.2
Installed capacity (MW)0Rounded figures
56.4
Generation capacity attributable to the bonds (MW) 0Rounded figures
28.3
Project category
Expansion of charging infrastructure Germany
Project name
123 charging points at 89 locations
Investments attributable to the bond (€m, per category)0Rounded figures
8.1
Project category
Total
Investments attributable to the bond (€m, per category)0Rounded figures
496.4
Installed capacity (MW)0Rounded figures
899.1
Generation capacity attributable to the bonds (MW) 0Rounded figures
246.9
Project category
Green subordinated bonds August 2019 (XS2035564975 & XS2035564629)
Project category
Wind offshore (Germany)
Project name
Hohe See0New build project (not in operation at the time of first allocation)
Installed capacity (MW)0Rounded figures
521.9
Generation capacity attributable to the bonds (MW) 0Rounded figures
204.6
Project name
Albatros0New build project (not in operation at the time of first allocation)
Installed capacity (MW)0Rounded figures
117.6
Generation capacity attributable to the bonds (MW) 0Rounded figures
48.5
Project category
Total wind offshore (Germany)
Investments attributable to the bond (€m, per category)0Rounded figures
839.7
Installed capacity (MW)0Rounded figures
639.5
Generation capacity attributable to the bonds (MW) 0Rounded figures
253.1
Project category
Wind onshore (Germany)
Project name
Hasel
Installed capacity (MW)0Rounded figures
9.9
Generation capacity attributable to the bonds (MW) 0Rounded figures
4.9
Project name
Brettenfeld
Installed capacity (MW)0Rounded figures
6.6
Generation capacity attributable to the bonds (MW) 0Rounded figures
3.2
Project name
Burgholz
Installed capacity (MW)0Rounded figures
9.9
Generation capacity attributable to the bonds (MW) 0Rounded figures
5.0
Project name
Rosenberg Süd
Installed capacity (MW)0Rounded figures
6.6
Generation capacity attributable to the bonds (MW) 0Rounded figures
3.2
Project name
Nonnweiler
Installed capacity (MW)0Rounded figures
4.8
Generation capacity attributable to the bonds (MW) 0Rounded figures
2.4
Project name
Rot am See II
Installed capacity (MW)0Rounded figures
3.3
Generation capacity attributable to the bonds (MW) 0Rounded figures
3.3
Project name
Prötzel I0New build project (not in operation at the time of first allocation)
Installed capacity (MW)0Rounded figures
9.0
Generation capacity attributable to the bonds (MW) 0Rounded figures
4.5
Project name
Rot am See I
Installed capacity (MW)0Rounded figures
9.9
Generation capacity attributable to the bonds (MW) 0Rounded figures
9.7
Project name
Webenheim
Installed capacity (MW)0Rounded figures
6.2
Generation capacity attributable to the bonds (MW) 0Rounded figures
3.1
Project name
Tantow0New build project (not in operation at the time of first allocation)
Installed capacity (MW)0Rounded figures
10.8
Generation capacity attributable to the bonds (MW) 0Rounded figures
1.1
Project name
Neuerdorf0New build project (not in operation at the time of first allocation)
Installed capacity (MW)0Rounded figures
8.4
Generation capacity attributable to the bonds (MW) 0Rounded figures
3.9
Project category
Total wind onshore (Germany)
Investments attributable to the bond (€m, per category)0Rounded figures
75.1
Installed capacity (MW)0Rounded figures
85.4
Generation capacity attributable to the bonds (MW) 0Rounded figures
44.5
Project category
Wind onshore (Sweden)
Project name
Röbergsfjället Vind
Installed capacity (MW)0Rounded figures
16.0
Generation capacity attributable to the bonds (MW) 0Rounded figures
16.0
Project name
Bliekevare Vind
Installed capacity (MW)0Rounded figures
32.0
Generation capacity attributable to the bonds (MW) 0Rounded figures
32.0
Project name
Säliträdberget Vind
Installed capacity (MW)0Rounded figures
16.0
Generation capacity attributable to the bonds (MW) 0Rounded figures
16.0
Project name
Hedbodberget Vind
Installed capacity (MW)0Rounded figures
10.0
Generation capacity attributable to the bonds (MW) 0Rounded figures
10.0
Project name
Granberg Vind
Installed capacity (MW)0Rounded figures
10.0
Generation capacity attributable to the bonds (MW) 0Rounded figures
10.0
Project name
Brahehus Vind
Installed capacity (MW)0Rounded figures
11.5
Generation capacity attributable to the bonds (MW) 0Rounded figures
11.5
Project name
Gnosjö Energie / Kulltorp
Installed capacity (MW)0Rounded figures
10.0
Generation capacity attributable to the bonds (MW) 0Rounded figures
10.0
Project category
Total wind onshore (Sweden)
Investments attributable to the bond (€m, per category)0Rounded figures
138.3
Installed capacity (MW)0Rounded figures
105.5
Generation capacity attributable to the bonds (MW) 0Rounded figures
105.5
Project category
Solar / PV (Germany)
Project name
Inzigkofen0New build project (not in operation at the time of first allocation)
Installed capacity (MW)0Rounded figures
7.5
Generation capacity attributable to the bonds (MW) 0Rounded figures
2.9
Project name
Leibertingen II0New build project (not in operation at the time of first allocation)
Installed capacity (MW)0Rounded figures
5.0
Generation capacity attributable to the bonds (MW) 0Rounded figures
1.9
Project name
Lindendorf0New build project (not in operation at the time of first allocation)
Installed capacity (MW)0Rounded figures
6.9
Generation capacity attributable to the bonds (MW) 0Rounded figures
3.4
Project name
Sophienhof I0New build project (not in operation at the time of first allocation)
Installed capacity (MW)0Rounded figures
8.6
Generation capacity attributable to the bonds (MW) 0Rounded figures
4.3
Project name
Alttrebbin0New build project (not in operation at the time of first allocation)
Installed capacity (MW)0Rounded figures
151.2
Generation capacity attributable to the bonds (MW) 0Rounded figures
22.2
Project category
Total solar / PV
Investments attributable to the bond (€m, per category)0Rounded figures
18.5
Installed capacity (MW)0Rounded figures
179.1
Generation capacity attributable to the bonds (MW) 0Rounded figures
34.8
Project category
Total
Investments attributable to the bond (€m, per category)0Rounded figures
996.5
Installed capacity (MW)0Rounded figures
1,009.5
Generation capacity attributable to the bonds (MW) 0Rounded figures
437.7
Project category
Green subordinated bond June 2020 (XS2196328608)
Project category
Wind onshore (France)
Project name

Refinancing of the acquisition of Groupe Valeco in 2019
Investments attributable to the bond (€m, per category)0Rounded figures

494.8
Installed capacity (MW)0Rounded figures
426.9
Generation capacity attributable to the bonds (MW) 0Rounded figures
264.3
Project category
Solar / PV (France)
Installed capacity (MW)0Rounded figures
89.0
Generation capacity attributable to the bonds (MW) 0Rounded figures
78.4
Project category
Total
Investments attributable to the bond (€m, per category)0Rounded figures
494.8
Installed capacity (MW)0Rounded figures
515.9
Generation capacity attributable to the bonds (MW) 0Rounded figures
342.7
Project category
Green subordinated bond August 2021 (XS2381272207)
Project category
Wind offshore (UK)
Project name
Morgan + Mona0New build project (not in operation at the time of first allocation)
Installed capacity (MW)0Rounded figures
1,500.0
Generation capacity attributable to the bonds (MW) 0Rounded figures
1,140.30Allocated share of generation capacity for information. Value is not representative as the project is still in the design phase.
Project category
Total wind offshore (UK)
Investments attributable to the bond (€m, per category)0Rounded figures
269.8
Installed capacity (MW)0Rounded figures
1,500.0
Generation capacity attributable to the bonds (MW) 0Rounded figures
1,140.3
Project category
Wind onshore (Germany)
Project name
Oberramstadt
Installed capacity (MW)0Rounded figures
8.4
Generation capacity attributable to the bonds (MW) 0Rounded figures
3.4
Project name
Königsbronn
Installed capacity (MW)0Rounded figures
3.5
Generation capacity attributable to the bonds (MW) 0Rounded figures
3.5
Project name
Hüttersdorf0New build project (not in operation at the time of first allocation)
Installed capacity (MW)0Rounded figures
6.6
Generation capacity attributable to the bonds (MW) 0Rounded figures
3.1
Project name
Tantow0New build project (not in operation at the time of first allocation)
Installed capacity (MW)0Rounded figures
10.8
Generation capacity attributable to the bonds (MW) 0Rounded figures
9.6
Project name
Prötzel V
Installed capacity (MW)0Rounded figures
18.0
Generation capacity attributable to the bonds (MW) 0Rounded figures
18.0
Project name
Obhausen
Installed capacity (MW)0Rounded figures
36.0
Generation capacity attributable to the bonds (MW) 0Rounded figures
13.4
Project name
Krautheim0New build project (not in operation at the time of first allocation)
Installed capacity (MW)0Rounded figures
12.6
Generation capacity attributable to the bonds (MW) 0Rounded figures
12.4
Project category
Wind onshore (Sweden)
Project name
Rammarehemmet
Installed capacity (MW)0Rounded figures
12.6
Generation capacity attributable to the bonds (MW) 0Rounded figures
12.6
Project category
Total wind onshore
Investments attributable to the bond (€m, per category)0Rounded figures
94.3
Installed capacity (MW)0Rounded figures
95.9
Generation capacity attributable to the bonds (MW) 0Rounded figures
76.0
Project category
Solar / PV (Germany)
Project name
Weesow-Willmersdorf0New build project (not in operation at the time of first allocation)
Installed capacity (MW)0Rounded figures
187.0
Generation capacity attributable to the bonds (MW) 0Rounded figures
93.7
Project name
Maßbach0New build project (not in operation at the time of first allocation)
Installed capacity (MW)0Rounded figures
28.0
Generation capacity attributable to the bonds (MW) 0Rounded figures
13.2
Project name
Alttrebbin0New build project (not in operation at the time of first allocation)
Installed capacity (MW)0Rounded figures
151.2
Generation capacity attributable to the bonds (MW) 0Rounded figures
53.6
Project name
Gottesgabe0New build project (not in operation at the time of first allocation)
Installed capacity (MW)0Rounded figures
152.6
Generation capacity attributable to the bonds (MW) 0Rounded figures
76.5
Project category
Total solar / PV
Investments attributable to the bond (€m, per category)0Rounded figures
121.6
Installed capacity (MW)0Rounded figures
518.8
Generation capacity attributable to the bonds (MW) 0Rounded figures
236.9
Project category
Expansion of charging infrastructure Germany
Project name
2021: 450 charging points at 242 locations
Investments attributable to the bond (€m, per category)0Rounded figures
12.5
Project category
Total
Investments attributable to the bond (€m, per category)0Rounded figures
498.2
Installed capacity (MW)0Rounded figures
2,127.3
Generation capacity attributable to the bonds (MW) 0Rounded figures
1,453.2
Project category
Green senior bond November 2022 (XS2558395351)
Project category
Wind offshore (UK)
Project name
Morgan + Mona0New build project (not in operation at the time of first allocation)
Installed capacity (MW)0Rounded figures
1,500.0
Generation capacity attributable to the bonds (MW) 0Rounded figures
359.70Allocated share of generation capacity for information. Value is not representative as the project is still in the design phase.
Project name
Morven0New build project (not in operation at the time of first allocation)
Installed capacity (MW)0Rounded figures
1,450.0
Generation capacity attributable to the bonds (MW) 0Rounded figures
1,809.70Allocated share of generation capacity for information. Value is not representative as the project is still in the design phase.
Project category
Total wind offshore (UK)
Investments attributable to the bond (€m, per category)0Rounded figures
151.1
Installed capacity (MW)0Rounded figures
2,950.0
Generation capacity attributable to the bonds (MW) 0Rounded figures
2,950.0
Project category
Wind onshore (Germany)
Project name
Oberramstadt
Installed capacity (MW)0Rounded figures
8.4
Generation capacity attributable to the bonds (MW) 0Rounded figures
4.6
Project name
Schwienau III
Installed capacity (MW)0Rounded figures
12.6
Generation capacity attributable to the bonds (MW) 0Rounded figures
12.6
Project name
Hüttersdorf0New build project (not in operation at the time of first allocation)
Installed capacity (MW)0Rounded figures
6.6
Generation capacity attributable to the bonds (MW) 0Rounded figures
3.4
Project name
Obhausen
Installed capacity (MW)0Rounded figures
36.0
Generation capacity attributable to the bonds (MW) 0Rounded figures
22.6
Project name
Steinheim0New build project (not in operation at the time of first allocation)
Installed capacity (MW)0Rounded figures
21.0
Generation capacity attributable to the bonds (MW) 0Rounded figures
21.0
Project name
Wulkow-Trebnitz0New build project (not in operation at the time of first allocation)
Installed capacity (MW)0Rounded figures
21.0
Generation capacity attributable to the bonds (MW) 0Rounded figures
21.0
Project name
Düsedau II0New build project (not in operation at the time of first allocation)
Installed capacity (MW)0Rounded figures
22.4
Generation capacity attributable to the bonds (MW) 0Rounded figures
22.4
Project name
Häusern0New build project (not in operation at the time of first allocation)
Installed capacity (MW)0Rounded figures
6.9
Generation capacity attributable to the bonds (MW) 0Rounded figures
6.9
Project name
Hohenstadt0New build project (not in operation at the time of first allocation)
Installed capacity (MW)0Rounded figures
12.6
Generation capacity attributable to the bonds (MW) 0Rounded figures
12.6
Project name
Lentföhrden0New build project (not in operation at the time of first allocation)
Installed capacity (MW)0Rounded figures
24.0
Generation capacity attributable to the bonds (MW) 0Rounded figures
24.0
Project name
Veringenstadt B0New build project (not in operation at the time of first allocation)
Installed capacity (MW)0Rounded figures
4.2
Generation capacity attributable to the bonds (MW) 0Rounded figures
4.2
Project name
Prötzel II0New build project (not in operation at the time of first allocation)
Installed capacity (MW)0Rounded figures
37.8
Generation capacity attributable to the bonds (MW) 0Rounded figures
37.8
Project name
Schwienau III
Installed capacity (MW)0Rounded figures
12.6
Generation capacity attributable to the bonds (MW) 0Rounded figures
12.6
Project category
Total wind onshore
Investments attributable to the bond (€m, per category)0Rounded figures
304.5
Installed capacity (MW)0Rounded figures
226.1
Generation capacity attributable to the bonds (MW) 0Rounded figures
205.7
Project category
Solar / PV (Germany)
Project name
Widdern
Installed capacity (MW)0Rounded figures
9.0
Generation capacity attributable to the bonds (MW) 0Rounded figures
8.6
Project name
Birkenfeld0New build project (not in operation at the time of first allocation)
Installed capacity (MW)0Rounded figures
5.8
Generation capacity attributable to the bonds (MW) 0Rounded figures
2.8
Project name
Ulrichshof
Installed capacity (MW)0Rounded figures
6.5
Generation capacity attributable to the bonds (MW) 0Rounded figures
3.3
Project category
Total solar / PV (Germany)
Investments attributable to the bond (€m, per category)0Rounded figures
8.4
Installed capacity (MW)0Rounded figures
21.3
Generation capacity attributable to the bonds (MW) 0Rounded figures
14.6
Project category
Expansion of charging infrastructure Germany
Project name
2022: 523 charging points at 230 locations
Investments attributable to the bond (€m, per category)0Rounded figures
34.8
Project category
Total
Investments attributable to the bond (€m, per category)0Rounded figures
498.8
Installed capacity (MW)0Rounded figures
3,197.4
Generation capacity attributable to the bonds (MW) 0Rounded figures
2,030.0

As of 31 December 2022

less more
Download image

Green senior bond November 2022 (XS2558395278)

The proceeds from the bond were used to refinance individual projects and investment measures in the electricity distribution network of NetzeBW GmbH from 2020 and 2021. NetzeBW GmbH is a subsidiary of EnBW AG and is responsible for the expansion of the electricity distribution networks in Baden-Württemberg.

Project category
Number of projects or investment measures attributable to the bond
Investments attributable to the bond (€m)0Figures rounded
Project category
Electricity distribution grids Germany
Number of projects or investment measures attributable to the bond
5,338
Investments attributable to the bond (€m)0Figures rounded
497.1

As of 31 December 2022

less more