EnBW Baltic 2 wind farm
The 80 large wind turbines at EnBW Baltic 2 rise high above the waves of the Baltic Sea. The second EnBW wind farm was officially placed into operation on 21 September 2015. The turbines use the powerful and constantly blowing wind to generate electricity for an aggregate of 340,000 households.
Partners – our suppliers and service providers
Many leading international companies from the wind power and offshore industry, along with regional specialists, are involved in the planning, logistics and construction of our wind farm.
Foundations
(Design, manufacture, transportation and installation): |
HGN joint venture (Hochtief Solutions, GeoSea, Nordsee Naßbagger) Hamburg, Germany
|
Internal wind farm cabling
|
Transportation and laying: Siem Offshore Contractors GmbH, Leer, Germany
Cable manufacture: DRAKA, Drammen, Norway |
Transformer platform
(Design, manufacture, transportation and installation): |
Alstom Weserwind joint venture, Bremen, Germany
|
Wind power plants
(Design, manufacture, transportation and installation): |
Manufacture: Siemens Windpower, Brande, Denmark
Transportation and construction: HGN joint venture (Hochtief Construction, GeoSea, Nordsee Naßbagger), Hamburg, Germany |
Provision of the necessary port infrastructure
|
Mukran Port, Sassnitz
|
Delivery of cable protection systems:
|
Tekmar Energy Ltd., Newton Aycliffe, UK
|